Trusted by product teams at leading enterprises and startups
A quality assurance program is only as good as the team behind it. Quality Teams helps you build that team: defining the roles, hiring the right people, documenting how the team works, and training it to run an effective QA process on its own.
Whether you are standing up a QA function from scratch or growing a thin one, Think Tank QA guides you through designing the team structure, hiring QA professionals from leads to SDETs, and putting the process and documentation in place so quality does not depend on who happens to be on the ticket.
This is help building your team, not testing done for you and not testers rented by the month.
What's Included
What Building a QA Team Involves
Building a QA team is more than filling seats. It covers the structure the team works inside, the people in it, the process they follow, and the training that gets them working as a unit. Think Tank QA works across all four.
01
Team and Practice Design
The work starts with the shape of the team: the roles it needs, how they fit together, and the structure that matches the business goals and the way the product is built. A small team shipping one product needs a different structure than a function supporting several teams at once.
Designing the structure before hiring means each hire fills a defined role rather than adding an undefined headcount. Where the broader QA practice itself needs to be designed, the process model, tooling, and how quality is run across the company, that is the work of QA practice development; Quality Teams builds and staffs the team that runs the practice.
02
Hiring and Placement
Hiring the wrong QA person costs real money and time, and a bad hire on a small team can set quality back for months. The work here is identifying, screening, interviewing, and hiring people with the skills and experience to fill the defined roles, across the range of a QA team from QA leads to manual testers to SDETs.
Think Tank QA can draw on its own talent pool or help screen and assess candidates the client has already sourced. The people hired are the client’s employees on the client’s team. For adding vetted QA people to an existing team as managed capacity rather than building the team itself, that is staff augmentation.
03
Process Documentation
A team that runs on undocumented, in-the-head process breaks when a key person leaves and takes months to onboard each new hire.
Documentation captures the roles, responsibilities, and the QA process so each team member understands and can execute their part, and so the practice survives turnover.
Experienced engineers document how the work is done, from how testing is planned and tracked to how defects are reported and handed off, giving the team a written standard to work from rather than a different approach on every ticket.
04
Training and Enablement
Hiring and documentation only pay off when the team can actually work from them. Training gets each team member working collaboratively and within scope, following the documented process, so the team operates as a coordinated function rather than a set of individuals testing in their own way.
The aim is a team that runs the QA process well on its own, without ongoing dependence on outside help.
The Process
How Engagements Run
A Quality Teams engagement is fitted to where the client is starting, building a function from scratch is a different scope than professionalizing a team that already exists, and to the roles and structure the team needs. A typical engagement moves through four stages.
01
Design the Team
The engagement opens by evaluating the business goals and the way the product is built, then designing a team structure and the roles it needs. The scope, the roles to fill, and the structure are agreed before hiring or training starts.
02
Document the Roles and Process
Roles, responsibilities, and the QA process are documented so the team has a written standard to work from. Documentation can run alongside hiring, so the people coming in have a defined role and process waiting for them rather than arriving to an undefined function.
03
Hire and Screen
People are identified, screened, interviewed, and hired against the defined roles, drawing on Think Tank QA’s talent pool or screening the client’s own candidates. The roles set in the design stage are what the hiring is measured against, so each hire fills a real gap.
04
Train the Team
Finally, each team member is trained to work within the documented process and collaborate as a unit, so the team can run an effective QA process on its own. The engagement is built to hand the client a working team, not a standing dependency.
Who This Is For
- Engineering and product leaders standing up an in-house QA function from scratch
- Teams growing a thin or informal QA team into a structured one
- Organizations whose QA quality depends on specific people and breaks when they leave
- Leaders who want to own QA capability in-house rather than keep outsourcing the testing
Engagement Deliverables
- A QA team structure and role definitions aligned with the business goals
- Hired QA team members, from QA leads to SDETs, screened and interviewed against the defined roles
- Documented roles, responsibilities, and QA process the team works from
- A trained team able to run an effective QA process on its own
Frequently Asked Questions
It means building an in-house quality assurance team that the client employs, rather than renting testers or outsourcing the work. Think Tank QA helps design the team structure, define the roles, and identify, screen, interview, and hire QA professionals to fill them, from QA leads to manual testers to SDETs. The people hired are the client’s own employees on the client’s team. The work also covers documenting the roles and process and training the team so it runs an effective QA process on its own. The goal is a team the client owns and operates, built to be effective without ongoing outside dependence.
Starting from scratch begins with design rather than hiring. Think Tank QA works with you to evaluate your business goals and the way your product is built, then designs a team structure and the roles it needs, so the first hires fill defined seats rather than guesses. From there the work covers identifying, screening, and interviewing candidates against those roles, documenting how the team will work, and training the team once it is in place. Building from scratch usually means starting with a core team and a documented process, then growing it. The sequence, design, document, hire, train, is the same whether you are building one team or several.
The work covers the range of roles a QA team needs, from QA leads who set direction and own the practice, to manual and exploratory testers, to SDETs and automation engineers who build and maintain automated tests. The specific roles depend on the team structure designed for your goals and the way your product is built. A team focused on a single web product needs a different mix than one supporting several teams or a heavy automation effort. The roles are defined in the design stage, before hiring, so each hire fills a real gap in a planned structure rather than adding undefined headcount.
Documentation captures the roles and the QA process so the team has a written standard to work from rather than a different approach on every ticket. That covers role definitions and responsibilities, so each member knows what they own, and the process itself: how testing is planned and tracked, how defects are reported and handed off, and how the team works together. The point of documentation is durability. A team running on in-the-head process breaks when a key person leaves and is slow to onboard new hires. Written roles and process let the practice survive turnover and let a new hire get productive faster.
Both. Hiring is one stage of four. The work also covers designing the team structure the hires fit into, documenting the roles and process, and training the team to work within that process as a coordinated unit. A group of skilled individual testers without a shared structure, documented process, or training is not a working team. The aim is a team that runs an effective QA process together, not a set of strong resumes. Training gets each member working collaboratively and within scope, so the team operates as a function rather than as people testing in their own separate ways.
It depends on the scope, the roles to fill, and how much is being built. Standing up a function from scratch, designing the structure, documenting the process, hiring a core team, and training it, is a larger effort than professionalizing a team that already exists. Hiring timelines in particular depend on the roles and the candidate market. Rather than commit to a fixed window, an engagement is scoped to what is being built once the team design and the roles are agreed. The design and documentation work can run alongside hiring, so the process and roles are ready as people come in rather than after.
Staff augmentation places vetted QA people onto your existing team to add capacity. Those are Think Tank QA people working inside your function, and they leave when the need ends. Quality Teams helps you build the team itself: defining the roles, hiring people you employ, documenting the process, and training the team to run on its own. The simplest way to hold the line: staff augmentation adds people to a team that exists; Quality Teams builds the team in the first place. If you need more hands on an existing team now, staff augmentation fits; if you want to own a QA team long-term, Quality Teams is the path.
QA practice development designs the QA practice: the process model, the tooling, the way quality is run across the company. Quality Teams builds and staffs the actual team that runs that practice: the people, the roles, the hires, and the training. One designs the practice; the other builds the team. They fit together on a larger effort, with practice development setting the blueprint and Quality Teams hiring and training the team to work inside it. If you need to define how QA should operate, practice development is the starting point; if you need to build the team that does the work, Quality Teams is the fit. Many engagements involve both.
The testing services are Think Tank QA running the work for you. Manual testing and automated testing put Think Tank QA testers and engineers on your product directly. Quality Teams does not run the testing; it builds the in-house team that runs the testing itself. If you want testing done now, the execution services fit. If you want to own the capability and have your own people doing the work long-term, Quality Teams builds that team. Some organizations use both: execution services for testing today while an in-house team is being built and trained to take it over.
That is the goal of the engagement. The documentation and training exist precisely so the team can run an effective QA process on its own, without ongoing dependence on outside help. The team is the client’s employees, working from a documented process they were trained on, inside a structure designed for the client’s goals. Some clients keep a relationship for later hiring rounds or for separate testing work, but the team itself is built to operate independently. A team that only works while outside help is present has not been built, only borrowed; the aim here is a function the client owns and runs.
Yes. Not every engagement is a from-scratch build. A common case is a team that exists but underperforms because there is no shared process: every tester works differently, little is documented, and onboarding is slow. The work there focuses on the structure, documentation, and training rather than only hiring, defining the roles clearly, documenting the QA process, and training the team to work from it as a unit, with new hires added where the structure has gaps. The result is a team running on a consistent, documented process rather than on whoever happens to be on the ticket.
The deliverables are built to leave the client with a working, owned QA team: a team structure and role definitions aligned with the business goals; QA team members hired and screened against those roles, from QA leads to SDETs; documented roles, responsibilities, and a QA process the team works from; and a trained team able to run that process on its own. Together they turn an undefined or absent QA function into a structured, documented team the client employs and operates. The documentation in particular outlasts any single hire, so the practice survives turnover rather than living in one person’s head.
Get Started
Quality Teams engagements are scoped to where you are starting, building a function from scratch or professionalizing one you have, and to the roles and structure the team needs. Reach out to discuss what you are building and where help with hiring, documentation, and training would do the most.